Item |
Description |
year |
| 1 |
EWA Tender: Re-conditioning of pumps at various water transmission stations (22 Pumps) |
2010
BD 29,000/- |
| 2 |
EWA Tender: Term Contract for the Annual Maintenance of E.O.T. Cranes at Riffa Power Station (2 Year Contract)
|
2010-12
BD 25,000/- |
| 3 |
EWA Tender: Removal, inspection, repair of shaft & re-installation of sea water rotating screen at Sitra Power & Water Station.
|
2010
BD 36,000/- |
| 4 |
Design, fabrication & Installation of Flow Control Baffle plates (SS material) for the steam turbine sea water exit pit to control the sea water flow at Al Ezzel Power Station
|
2010
BD 34,000/- |
| 5 |
Siemens (Al Ezzel Power Plant) Supply of skilled manpower for plant maintenance
|
2010
BD 8,500/- |
| 6 |
GPIC – Shutdown 2010, Supply of skilled manpower
|
2010
BD 21,000/- |
| 7 |
GIIC – Shutdown 2010, Supply of skilled/un-skilled manpower
|
2010
BD 40,000/- |
| 8 |
GARMCO – Supply of manpower for their shutdown
|
2009
BD 10,000 |
| 9 |
United Stainless Steel Co. Supply of permanent manpower (Ongoing Annual Contract)
|
2009-10
BD 110,000 |
| 10 |
Danieli – USCO Plant, Hidd: Fabrication & Installation of mechanical plant equipment
|
2009
BD 24,250/- |
| 11 |
CHAPO - Renaissance Hotel Project (Amwaj Island): Fabrication, Supply & Erection of Steel Structures 500 Tons +
|
2009-10
BD 500,000 |
| 12 |
B & W Mechanical (U.K) Manufacture and Supply of Ship Loaders (Bahrain, Sharjah, Vietnam, Singapore) |
2008 / 2009
(US$. 1,000,000/-) |
| 13 |
Removal of Old Sheets and Supply and Fixing of Roof Sheets for mechanical workshop at Sitra Power & Water station |
2009
(BD. 45,000/-) |
| 14 |
Truba Jaya Engineering (GIIC Expansion project) Erection of Steel Structures (Approx. 400 Tons) |
2009
(BD. 106,000/-) |
| 15 |
Kobe Steel Co. (GIIC Expansion Project) fabrication and Supply of steel structures |
2008/2009
(US$. 600,000/-) |
| 16 |
Nippon Conveyors Co. (GIIC Expansion project) Fabrication & Supply of Steel Structures |
2009
(US$. 50,000/-) |
| 17 |
Jurong Engineering (GIIC Expansion project) Fabrication, supply & Erection of tank liners and miscellaneous steel structures |
2008/2009
(BD. 120,000/-) |
| 18 |
GIIC: Tie in connections for gas Pipes and fire fighting water lines |
2009
(BD. 21,000/-) |
| 19 |
Hidd Power Company: Modification of the Turbine exhaust supports |
2008/2009
(BD. 30,000/-) |
| 20 |
Nass marine: Fabrication/blasting & painting |
2008
( BD. 350,000/-) |
| 21 |
ScanTech International: Fabrication & Supply of Steel Structures |
2008
(BD. 50,000/-) |
| 22 |
BRAMCO: Steel repair works onboard MV Rock Express |
2008
(US$. 500,000/-) |
| 23 |
Aqua Leisure: City Center project, fabrication & Installation of Steel structure for the Water park |
2008
(BD. 15,000/-) |
| 24 |
Danieli: USCO Plant- Erection of Wind Shield Structure |
2008
(BD. 10,500/-) |
| 25 |
Danieli: USCO Plant- Various steel structure modification works |
2007/2008
(BD. 250,000/-) |
| 26 |
Fabrication and installation of steel structures and sheeting for extended roof at Universal Rolling Mills |
2008
(BD. 6,500/-) |
| 27 |
Inspection, Overhauling & performance Testing of Diesel Engine for 2 MVA Emergency generator at Riffa Power Station |
2008
(BD. 43,250/-) |
| 28 |
Inspection & Overhauling of the 25 KVA & 35 KVA Diesel Engines for Emergency generators at Riffa Power Station. |
2008
(BD. 12,540/-) |
| 29 |
Term Contract for the Annual Maintenance of E.O.T. Cranes at Riffa Power Station |
2008/2009
(BD. 9,500/-) |
| 30 |
Term Contract for the Annual Maintenance of E.O.T. Cranes at Riffa Power Station |
2007/2008
(BD. 9,500/-) |
| 31 |
Term Contract for the Annual Maintenance of all E.O.T. Cranes at Sitra Power & Water Station (2 year contract) |
2008/2010
(BD. 42,000/-) |
| 32 |
Term Contract for the Annual Maintenance of all E.O.T. Cranes at Sitra Power & Water Station (2 year contract) |
2006/2008
(BD. 31,000/-) |
| 33 |
Fabrication & Erection of Steel Structure for Aluminium cube and Red Box extended window for Cebarco (City Center Project) |
2008
(BD. 28,000/-) |
| 34 |
Fabrication, Erection and Fire proofing of Steel Bridge for Projects Construction for the Regency Intercontinental Car Park & Health Club Building which is under construction |
2007-2008
(BD.64,000/-) |
| 35 |
Fabrication and installation of handrails and light steel structures at Riffa Views (Sub-contracted from Projects Construction) |
2008/2009
(BD. 309,000/-) |
| 36 |
Universal Rolling: Fabrication & Supply of Crane Girders 2 nos. |
2008
(BD. 14,900/-) |
| 37 |
Supply of manpower for shutdown works at GIIC |
2008
(BD. 40,000/-) |
| 38 |
Supply of Manpower for major shutdown works to GPIC |
2007
(BD. 46,000/-) |
| 39 |
Sub-Contract Steel Fabrication works from Ahmed Mansoor Al A’Ali |
2006/2007
(BD. 100,000/-+) |
| 40 |
Fabrication, Blasting, Painting & Supply of Steel works for Nass Marine |
2006/2007
(BD. 80,000/- +) |
| 41 |
Supply of Manpower to Siemens (Al Ezzel Power Plant) |
2006/2007
(BD. 24,000/-+) |
| 42 |
Term Contract for the Annual Maintenance of E.O.T. Cranes at Riffa Power Station |
2006/2007
(BD. 9,500/-) |
| 43 |
Fabrication of Steel Work tables for pre-cast concrete (Total 30 tables) for Al Hamad Construction |
2007
(BD. 140,000/-) |
| 44 |
Fabrication, Supply & Installation of Handrails for Al Hamad Construction (Financial Harbour Project) |
2007
(BD. 95,000/-+) |
| 45 |
Installation of spool piece after removal of blank on crossover pipe at Hidd Power Company |
2007
(BD. 4,500/-) |
| 46 |
Fabrication & erection of Steel brackets for Column Cladding for Al Hamad Construction (Financial Harbour Project) |
2007
(BD. 30,000/-) |
| 47 |
MEW Tender: Removal, Inspection, sandblasting, Painting and Re-installation of Sea water intake rotary screens (2 Nos.) |
2007
(BD. 18,900/-) |
| 48 |
MEW Tender: Inspection, Cleaning, sandblasting & painting of steel structure and timber deck at SPWS |
2007
(BD. 30,800/-) |
| 49 |
Fabrication, Blasting, Painting & Supply of Steel Beams to Cybarco (Bahrain City Center Project) |
2006/2007
(BD. 150,000/-+) |
| 50 |
Repair, cleaning and sanitation of U/G Tanks at Hawar Power and Water Station |
2007
(BD. 45,000/-) |
| 51 |
Fabrication, Blasting, Painting & Supply of Steel works for Nass Marine |
2006/2007
(BD. 80,000/- +) |
| 52 |
Term Contract for the Annual Maintenance of E.O.T. Cranes at Riffa Power Station |
2005/2006
(BD. 9,500/-) |
| 53 |
Sub Contract work for Blasting & Painting of Steel Pipes from Shaw Nass for the Dolphin Upstream Project |
2005/2006
(BD. 300,000/- +) |
| 54 |
Regular ongoing works at GIIC Shutdown |
2006
(BD. 60,000/-+) |
| 55 |
Sub Contract work for Fabrication and Painting of Pipe Supports from Shaw Nass for the Dolphin Upstream Project |
2005/2006
(BD. 250,000/- +) |
| 56 |
Emergency Pipe repair works done at Hidd Power Company |
2006
(BD.14,000/-) |
| 57 |
Steel fabrication, supply and Erection works from Danieli for the United Stainless Steel Plant |
2006 - 2008
(BD. 250,000/-) |
| 58 |
Fabrication, Blasting, Painting & Supply of Steel Beams to Cybargo (Bahrain City Center Project) |
2006/2008
(BD. 2000,000/-) |
| 59 |
Inspection, Testing, Supply & Fabrication of Vacuum Pipes at Hidd Power Company |
2006
(BD. 14,000/-) |
| 60 |
Fabrication & Supply of Slab Frame Structure to Cybargo (Bahrain City Center Project) |
2006
(BD. 6,000/-) |
| 61 |
Dismantling & Shifting of Belt Conveyor System at GIIC |
2006
(BD. 4,840/-) |
| 62 |
Manpower Supply to Hidd Power Company |
2006
(BD. 4,800/-) |
| 63 |
Supply of Specialist manpower to MEW Hawar P/S |
2006-2009
(BD. 190,000/-) |
| 64 |
Supply of manpower to GIIC for shutdown maintenance works |
2006
(BD. 25,000/-+) |
| 65 |
Various Fabrication, erection and Mechanical works at GIIC |
2006
(BD. 50,000/-+) |
| 66 |
Blasting & Painting of Coarse Screens for MEW/SPWS |
2006
(BD. 3,745/-) |
| 67 |
Sandblasting & Painting of Aux. Boiler Chimney Stack at Sitra Power & Water Station (1 No.) |
2005
(BD. 3,000/-) |
| 68 |
Replacement of 2 Mtr. Butterfly Valves (3 Nos) for Sea Water Intake Lines at Hidd Power & Water Station |
2005
(BD. 4,700/-) |
| 69 |
Repair and testing of Boiler bank and membrane tubes of Aux. boiler at Hidd Power & Water Station |
2005
(BD. 5,700/-) |
| 70 |
Sandblasting & Painting of Distiller Pump and discharge Pipe at Sitra Power & Water Station (1 No.) |
2005
(BD. 810/-) |
| 71 |
Term Contract for the Annual Maintenance of E.O.T. Cranes at Riffa Power Station |
2004/2005
(BD. 9,000/-) |
| 72 |
Repair/Refurbish/Replace of (2 Nos.) complete Boilers and chimneys at MEW - Hawar Desalination Plant |
2005
(BD. 21,450/-) |
| 73 |
Replacement of Annular cooler outer and inner screed wall at G.I.I.C. |
2005
(BD. 16,000/-) |
| 74 |
Installation of Motorized DD Valves for feed hoppers at G.I.I.C. |
2005
(BD. 1,200/-) |
| 75 |
Removal, Inspection, Sandblasting, Painting & Re-installation on Sea water intake rotating screen 1 & 2 |
2005
(BD. 15,750/-) |
| 76 |
Fabrication and replacement of De-dusting duct for the dust collector B-Mill at G.I.I.C. |
2005
(BD. 1,250/-) |
| 77 |
Removal/replacement/fabrication & erection of old pipes at G.I.I.C. |
2005
(BD. 10,000/-) |
| 78 |
Grit blasting of Steel shell of rolling mill at G.I.I.C. |
2005
(BD. 17,000/-) |
| 79 |
Supply of manpower for major cold shutdown at G.I.I.C |
2005
(BD. 35,000/-) |
| 80 |
Supply of manpower for major cold shutdown at G.P.I.C |
2004/2005
(BD. 33,000/-) |
| 81 |
Erection, Installation, Alignment of Rails for E.O.T. Cranes
(3 Nos) at Universal Rolling Mills |
2005
(BD. 5,500/-) |
| 82 |
Installation of the current collector system for E.O.T. Cranes
(3 Nos) at Universal Rolling Mills |
2005
(BD. 1,700/-) |
| 83 |
Supply of filter elements to BANAGAS |
2004/2005 |
| 84 |
Replaced the hydraulic guillotine cylinder at the ALBA Coke Calcining Plant (Purchase Order No: S/45064689) |
2005
(BD. 890/-) |
| 85 |
Major inspection & overhauling of two (2) Niigata Diesel engine/Generators 1.6 MW at Hawar Power & water station |
2005
(BD.114,860/-) |
| 86 |
Painting of GTA 8 & GTA 9 Transformers at Riffa Power Station |
2005
(BD. 15,260/-) |
| 87 |
Supply of specialist manpower to ENCOCORP for fabrication and erection of Air Cooled Condensers at ALBA Line 5 project |
2004/2005
(BD. 60,000/-) |
| 88 |
Sandblasting & Painting of Boiler Chimney Stacks at Sitra Power & Water Station (4 Nos.) |
2004/2005
(BD. 15,000/-) |
| 89 |
Maintenance & Repair of E.O.T. Crane at G.A.C. Warehouse |
2004
(BD. 4,700/-) |
| 90 |
Overhaul/Repair/Refurbish of (6 Nos.) Water Pumps at various blending Stations for MEW – Water Transmission Directorate |
2004
(BD. 6,000/-) |
| 91 |
Overhaul/Repair/Refurbish of (5 Nos.) Water Pumps at various blending Stations for MEW – Water Transmission Directorate |
2004
(BD. 6,000/-) |
| 92 |
Overhaul/Repair/Refurbish of (2 Nos.) Standby Diesel Generators for MEW – Water Transmission Directorate |
2004
(BD. 1,950/-) |
| 93 |
Package steel fabrication projects sub-contracted from Ahmed Mansoor Al-A’ali for the ALBA Line 5 project |
2004
(BD. 100,000/-+) |
| 94 |
Supply of specialized manpower to GARMCO for their plant shutdown works |
2003
(BD. 10,000/-) |
| 95 |
Supply of specialist manpower to Lahoud Engineering for the Hidd Power Station Ph. II Fabrication & Erection Works |
2002/2003
(BD. 20,000/-) |
| 96 |
Boiler repair works for ALSTOM at Hidd Power & Water Station |
2003
(BD. 2,000/-) |
| 97 |
Supply of specialist manpower to Habib Ali Awachi for the Sitra Power & Water Station Rehabilitation Works |
2002/2003
(BD. 50,000/- +) |
| 98 |
Supply of specialist manpower to Siemens for the Riffa Power Station Rehabilitation Works |
2002/2003/
2004
(BD. 80,000/-+) |
| 99 |
Sandblasting & Painting of Chimney Stacks at Manama Power Station (11 Nos.) |
2003
(BD. 29,000/-) |
| 100 |
Supply of Specialist manpower (Skilled & un-skilled) to GIIC for their cold and hot shutdowns |
2002/2005/
(BD. 80,000/- +) |